Projects · Triton NeuroTech: Soft Exosuit ·

Workday 2 - 11/07/2026

Hey everyone,

Workday 2 was Saturday, 11/07/2026, and I wasn't there. I was traveling, so the hardware lead ran the whole thing. This is my first log written entirely from Discord messages and a sign-in sheet 😅.

The handoff

My original plan was a coding challenge in a browser simulator, since we still don't have parts. The hardware lead had a better idea: bring in a real muscle-sensing band and show everyone live signals, then go over how people actually clean up and decode those signals. Hardware would get set up in our CAD software and start designing. I said "you have the wheel," and they ran with it.

What happened

Twelve people showed up. The hardware side went off. Someone found a couple of papers with a different way to move the fingers than what we had planned, and the group got hooked on it. That turned into a Discord thread that went until like 7pm, almost 50 messages of people arguing about how to move each finger on its own. Nobody asked them to do that. They just cared.

The software side was a different story. None of the software team made it. Between texts, DMs, and emails I got a lot of "can't make it" messages this week, and I didn't really put together how many until it was over.

What I learned as a lead

  1. The team doesn't need me in the room. That's a good thing. A clear handoff to someone you trust works.
  2. Ideas move fast when you're gone. Hardware is now excited about a new direction, which is awesome, but it means we need to sit down together and decide on purpose instead of drifting into it.
  3. One whole half of my team was missing, and that's partly on me. Absences scattered across three different apps meant I never saw the full picture. I need one place where people tell us they're out, and I need to check in with my software people one on one to find out what would make Saturday worth showing up for.

Back next week, eh!