Projects · Triton NeuroTech: Soft Exosuit ·

Workday 1 - 10/31/2026

Happy Halloween! 🎃

Our first real workday was Saturday, 10/31/2026, from 11 to 2 in Franklin Antonio Hall. People showed up in costumes and gave up a Saturday on Halloween, which honestly made my week.

Before the workday

The week leading up to it was a lot. The hardware lead and I had to submit a literature review and a project proposal to the club the same day. We read (okay, skimmed hard 😂) nine papers between both teams and turned each one into a quick "steal or skip" summary: what did they build, what's worth copying, and what's way too much for a student team with a student budget. Two teammates sent in papers on their own, which was awesome to see this early.

My biggest worry was the slides. I kept thinking, if I don't enjoy this, why would anyone else? I did not want to stand up there and say "yo, read this." So I tried to make it as interactive as possible.

What we did

  • What we're building. A quick walkthrough of the goal and our first milestone, so everyone knows what we're working toward.
  • Kahoot! A little quiz to get the team introduced and gauge their understanding on the fundies.
  • Arduino intro. The teams went way past blinking an LED. One team built Pong controlled by a motion sensor. The other built Snake played with a joystick. Both worked! I was not expecting that on day one.

What I learned as a lead

  1. People rise to the level you set. I planned for blinking LEDs, and they built video games. Next time I'm starting them higher.
  2. Interactive beats informative. Students are already bored by lectures throughout the week, give them something fun.
  3. I'm still a brick at a lot of this technically, and that's okay. I said so out loud to the team, and I think it made people more comfortable asking questions.

Shoutout to everyone who came out. Stay safe, and see you next time!